|
|
![]()
|
|
2-yard mine scoop loading ore into a 10 tonne truck at the Santa Cruz mine
1400 tpd Guanacevi Plant site with flotation and leach circuits
Underground rock sampling in the North Porvenir mine
Pouring 25Kg Silver bars at the Guanacevi Plant site
Men working on the tanks at the leach circuit
|
|
|
- END -
|